Does a small yard or building project at Del Webb Lake Oconee need erosion control?
Yes. Greene County treats work inside a common development begun on or after August 2000 as needing a design-professional erosion plan, a land disturbance permit and an EPD notice of intent, and Del Webb opened in 2007. Confirm with Greene before starting. A Class Septic installs the silt fence, inlet protection and slope cover the plan calls for.↗↗
Reviewed by A Class Septic Services · Last updated
Local facts
Why Del Webb falls under the stricter permit lane
Each row links to the agency, code or publisher it comes from. Tap a source to check it yourself.
| Topic | What it says | Source |
|---|---|---|
| Opened | 2007, as PulteGroup's 55-plus community on the Greensboro side of the lake | Atlanta Agent Magazine, July 8, 2024: Del Webb at Lake Oconee to open sales at 116 homesites |
| Still building | 116 more homesites were released in mid-2024, after 775 homeowners had moved in | Same source as above |
| Greene's common-development trigger | Projects in a common development developed on or after August 2000 need an erosion plan, land disturbance permit and EPD notice of intent | Greene County, GA: Erosion Control Permit Requirements |
| Wait after filing | A state-mandated 14 days after the notice of intent before Greene issues permits | Same source as above |
| Soil | Wickham sandy loam, 2-6% slopes, at the community's mapped center | USDA NRCS Soil Data Access (SSURGO GA133 Greene County): map unit and septic absorption rating at 33.4823, -83.2638 |
The Del Webb Lake Oconee story
Small lot, big-development rules
A homeowner regrading a backyard or adding a screened porch on a 0.15-acre Del Webb lot is moving a few truckloads of dirt at most. In a county with no development history, that would fall into the simplest permit lane. Greene's rule looks at the neighborhood, not just the lot: anything inside a common development begun on or after August 2000 is listed as a trigger for the full treatment.↗↗
Del Webb at Lake Oconee opened in 2007, so ask Greene's building and zoning staff how your project is classified before anyone breaks ground. If it is in, expect an erosion plan prepared by a design professional, a land disturbance permit, a notice of intent filed with EPD through GEOS, and 14 days before permits issue.↗↗
The community is also still growing. With 116 homesites released in 2024, there are active builds beside finished homes, and red clay on a finished street or a choked curb inlet is the first thing a neighbor notices.↗
A homeowner regrading a backyard or adding a screened porch on a 0.15-acre Del Webb lot is moving a few truckloads of dirt at most.
More about Del Webb Lake Oconee
The controls that fit a Del Webb yard
Every control has to meet the Green Book, Georgia's Manual for Erosion and Sediment Control (2016 Edition) as in effect when the work was permitted. On a compact lot that usually means a short run of silt fence on the downhill line, inlet protection at the nearest curb drain, a stone pad where equipment enters, and straw or blanket on any bare slope the same day it is shaped.↗
Controls are not set-and-forget. After every hard rain the fence gets walked, sediment gets scraped from behind it, and torn sections get replaced before the next storm rather than after.
Wickham sandy loam is easy to grade and just as easy to wash. Its sandy surface moves in a hard rain long before clay would, so cover goes down fast.↗
Every control has to meet the Green Book, Georgia's Manual for Erosion and Sediment Control (2016 Edition) as in effect when the work was permitted.
More about Del Webb Lake Oconee
Lakefront homes: two more lines
Homes backing onto the water add Georgia Power's 25-foot vegetative buffer, where no grubbing or contour change is allowed without its written approval, and the state's own 25-foot buffer measured from the point of wrested vegetation on the bank.↗↗
Where EPD does grant a buffer variance, the mitigation is real work: on-site stormwater controls that hold the first inch of rain or treat runoff from the first 1.2 inches to cut suspended solids by 80 percent.↗
Homes backing onto the water add Georgia Power's 25-foot vegetative buffer, where no grubbing or contour change is allowed without its written approval, and the state's own 25-foot buffer measured from the point of wrested vegetation on the bank.
Warning signs
Signs the controls on a Del Webb job are failing
Seeing two or more of these? Call before it gets worse.
- 1. Sandy silt fanned across the sidewalk or street after rain
- 2. A curb inlet filter clogged or knocked aside
- 3. Silt fence sagging, undercut or missing a section
- 4. Bare graded soil left uncovered for more than a few days
- 5. Muddy water in a neighbor's yard or a lakeside cove
What it costs
Cost references for small-site erosion work
Grading and leveling a site
$1,000-$3,300
Typical market range — HomeAdvisor: Land Clearing Cost (updated Jun 17, 2026), 2026
Yard drainage system
$2,147-$7,173
Typical market range — HomeAdvisor: Yard Drainage System Cost (updated Jun 20, 2026), 2026
What moves the price
These are third-party typical market ranges, not our prices. Every job is quoted after we see it — estimates are free.
Free estimate: (678) 863-5620- 01Whether Greene classifies the job in the full-permit lane
- 02Design-professional plan fees for the erosion plan
- 03Inlet protection and street cleanup in a finished neighborhood
FAQ
Del Webb erosion control questions
Straight answers, with the rule or record behind them. Still unsure? Call and ask the crew that digs.
(678) 863-5620My project is tiny. Why would Greene want a full erosion plan?
Greene lists any project inside a common development developed on or after August 2000 as a trigger, regardless of size. Del Webb opened in 2007, so check with the county first.
Source: Greene County, GA: Erosion Control Permit Requirements
How long before work can start once the notice of intent is filed?
Greene notes a state-mandated 14-day wait after the notice is submitted through GEOS before it issues permits.
Source: Greene County, GA: Erosion Control Permit Requirements
What standard does the silt fence have to meet?
The Green Book, the 2016 Manual for Erosion and Sediment Control in Georgia, as in effect on January 1 of the year the work was permitted.
Source: Georgia Soil and Water Conservation Commission: Technical Guidance
My home backs onto the lake. Can I regrade down to the water?
No mechanical clearing or contour change is allowed in Georgia Power's 25-foot buffer or on its land without written approval.
Source: Georgia Power: Lake Oconee Shoreline Guidelines (PDF)
Is the sewer system growing along with the community?
Piedmont is spending $22 million to expand its Carey Station reclamation facility from 0.5 to 1.5 million gallons a day for growth in its Greene County communities.
Source: Piedmont Water: Carey Station Water Reclamation Facility expansion (Jan 2026)
Does a Del Webb lot count as being near state waters?
Lakefront lots may. Greene adds the full permit lane for work within 200 feet of state waters, which include lakes, creeks and spring-fed ponds.
Source: Greene County, GA: Erosion Control Permit Requirements
Nearby areas
Erosion control on other Lake Oconee shores
Sources
Where these facts come from
Rules, costs and local facts on this page link to the agency, code or publisher that states them. Cost figures are third-party market ranges, not our prices — estimates are free.
Reviewed by A Class Septic Services · Last updated
- 1Greene County, GA: Erosion Control Permit Requirements
- 2Atlanta Agent Magazine, July 8, 2024: Del Webb at Lake Oconee to open sales at 116 homesites
- 3USDA NRCS Soil Data Access (SSURGO GA133 Greene County): map unit and septic absorption rating at 33.4823, -83.2638
- 4MLS listing: Cypress Way home, Greensboro GA 30642 (Del Webb At Lake Oconee)
- 5Georgia Soil and Water Conservation Commission: Technical Guidance
- 6Georgia Power: Lake Oconee Shoreline Guidelines (PDF)
- 7GA EPD: Field Guide for Determining the Presence of State Waters That Require a Buffer (2017)
- 8GA EPD: Buffer Mitigation Guidance (May 2022)
- 9HomeAdvisor: Land Clearing Cost (updated Jun 17, 2026)
- 10HomeAdvisor: Yard Drainage System Cost (updated Jun 20, 2026)
- 11Piedmont Water: Carey Station Water Reclamation Facility expansion (Jan 2026)

Ready when you are
Planning a project at Del Webb? Sort the permit lane first.
Tell us what you are building and where on the lot. We will help you pin down which Greene permit applies, then install and maintain the controls the plan requires.