Septic permits & records
Greene County Environmental Health (Northeast Health District)
- Address
- 1031 Apalachee Ave, Greensboro, GA 30642
- Phone
- 706-453-4471
- Hours
- Specialists in the office 8:30-10:00 a.m., Monday-Friday

Greene County · Septic & site work
Get a free estimate
or call (678) 863-5620The short answer
Greene County Environmental Health in Greensboro issues the septic approval letter the county building office requires with any permit that will use septic. Lots need 0.75 acre on public water or 1.5 acres on a well, and the land within 75 feet of Lake Oconee's high-water line does not count. A residential repair permit is $200.↗↗↗
Reviewed by A Class Septic Services · Last updated
Local facts
Each row links to the agency, code or publisher it comes from. Tap a source to check it yourself.
| Topic | What it says | Source |
|---|---|---|
| Permit office | Greene County Environmental Health, 1031 Apalachee Avenue, Greensboro; 706-453-4471; specialists in the office 8:30-10 a.m. weekdays | Northeast Health District: Greene County locations (Environmental Health) |
| Minimum septic lot | 0.75 acre on public water, 1.5 acres on a private well, excluding land within 75 ft of Lake Oconee's high-water line | Greene County Board of Health: Lot Size Ordinance (effective Sept 7, 2018) |
| New residential septic inspection fee | $350; $400 for five or more bedrooms (August 1, 2024) | Greene County EH Fees (effective August 1, 2024) |
| Repair permit | $200 residential, $300 commercial | Same source as above |
| Soils and septic fields | About 38% of surveyed acreage very limited, 57% somewhat limited | USDA NRCS Soil Data Access: ENG Septic Tank Absorption Fields, survey area GA133 |
| Urban population | None: 100% of residents lived in rural areas at the 2020 census | Wikipedia: Greene County, Georgia |
| Housing | 10,830 units: 8,596 single-family detached, 1,260 mobile homes; median built 1997 | Census Reporter: Greene County, GA (ACS 2020-2024 5-year) |
The Greene County story
Drive Highway 44 south from Greensboro and the county changes in about ten minutes. Pasture and hay fields give way to the gates of Reynolds Lake Oconee, the shops at Lake Oconee Village and Harbor Club's 1,100 wooded acres along nine miles of shoreline. Del Webb's active-adult lake community sits on the Greene side too. Not one resident of the county counted as urban in 2020, yet its lakeshore is lined with gated golf communities.↗↗↗
That mix explains how septic gets decided here. The Board of Health wrote one of the stricter lot rules in the region, and it is aimed squarely at the lake: the strip within 75 feet of high water is subtracted before anyone checks whether a lot is big enough. A 0.8-acre lake lot with a long shoreline can come up short on paper. The ordinance also says its minimums assume a typical three or four-bedroom home, and that larger houses, pools, tennis courts or outbuildings can require more.↗
Off the lake, the work looks different: farmhouse tanks near Union Point and White Plains that have outlived their fields, new homes on wooded tracts toward Penfield, and long gravel drives that need grading before a well rig or a tank truck can reach the site.
Sewer or septic?
Greensboro runs its own sewer and goes further than the state: its code treats any property within 500 feet of a public sewer as served and lets the city order a connection within 90 days. Union Point runs its own small plant. Woodville, Siloam and White Plains have no municipal wastewater permit on record, so their homes use septic.↗
On the lake, Piedmont Water Company lists Reynolds at Lake Oconee among its sewer communities, along with the Highway 44 corridor in southern Greene. Most of it is low-pressure sewer with a grinder pump at each house, and Piedmont says the pump is the owner's. Some Reynolds homesites are still sold septic-required, such as a 1.17-acre lot on Cedar Ridge Drive. Harbor Club is not on Piedmont's list, and its homes are mostly on septic; Del Webb is on it.↗↗↗
Permits · Greene County Environmental Health, Northeast Health District
Call the Environmental Health manager at 706-453-4471 to request a septic letter or perc test; the building office will not accept a septic-dependent permit without that approval letter.↗
Check the lot against the Board of Health minimum: 0.75 acre on public water or 1.5 acres on a well, each with 25,500 square feet of usable soil, both measured without the 75 feet nearest Lake Oconee.↗
Pay the published fee: $350 for a new residential system ($400 at five bedrooms), $200 for a residential repair permit, $75 for a site plan review.↗
Install and pass the county's inspection while the permit is still valid; Georgia permits last no more than 12 months.↗
Georgia rule Greene County Board of Health lot size ordinance
“minimum lot sizes shall be exclusive of that portion of a lot lying within seventy-five (75’) of the high water level line of Lake Oconee”
Published fees
More about Greene County
Greene ties its land disturbance permit to the water. A plan, a land disturbance permit (with the septic letter if one applies) and an EPD notice of intent are required when the job is in a common development, disturbs more than an acre, or sits within 200 feet of state waters, which includes spring-fed ponds and creeks as well as the lake. After the notice goes to EPD, the county waits 14 days before issuing permits.↗
Most Reynolds and Harbor Club lots fall inside that 200-foot line, so clearing is planned around the paperwork. A home site under an acre and farther from water needs only a stand-alone erosion plan, and the county issues that permit free.↗
Georgia Power adds its own limits at the shore. Nobody grubs or regrades the 25-foot buffer or project land without its written approval, and roof drains or yard pipes have to stop at the boundary and spread into a swale, French drain or dry creek bed rather than running to the water.↗
Greene ties its land disturbance permit to the water.
Soil & terrain
Cecil is the biggest soil in Greene, about 87,500 of 259,900 surveyed acres, followed by Lloyd, which maps right under downtown Greensboro as a gravelly loam. Both are workable red-clay uplands. The trouble spots are Cataula, Helena and Hard Labor, about 35,000 acres together, whose subsoils slow water down.↗
Greene drains three ways. West of a line through Woodville, Union Point and White Plains it falls to the Upper Oconee and the lake; the rest splits between the Little River of the Savannah basin and the Upper Ogeechee.↗
Cecil↗
About 87,500 acres, the county's largest component.
Lloyd↗
About 31,600 acres; gravelly loam under downtown Greensboro.
Pacolet↗
About 24,400 acres of sloping upland.
Chewacla↗
About 20,300 acres of wet floodplain.
Cataula, Helena and Hard Labor↗
About 35,000 acres with slow subsoils.
Services here
Also available:Grading & Driveway PreparationSewer Line Builds, Taps & RebuildsFrench Drain InstallationBasement Excavation
Towns we serve
Who to call at the county
Septic permits & records
FAQ
Straight answers, with the rule or record behind them. Still unsure? Call and ask the crew that digs.
(678) 863-5620The Board of Health sets 0.75 acre on public water and 1.5 acres on a private well, each with 25,500 square feet of usable soil, for a typical three or four-bedroom home. Land within 75 feet of Lake Oconee's high-water line does not count.
Source: Greene County Board of Health: Lot Size Ordinance (effective Sept 7, 2018)
Under fees effective August 1, 2024, a new residential system inspection is $350, or $400 at five or more bedrooms; a residential repair permit is $200 and a site plan review $75. Those are county fees, separate from the work.
Both. Piedmont Water lists Reynolds among its sewer communities, mostly low-pressure systems with a grinder pump at each house, but some Reynolds homesites are sold septic-required. Get the lot's utility letter first.
Source: Piedmont Water Company: Wastewater Services (sewer communities list)
Piedmont Water says the grinder pump is the homeowner's property and responsibility, and its systems are built around E/One pumps, so a different brand can cause backups. We trench and lay the service line; Piedmont handles its own main.
Usually. The county requires an erosion plan, a land disturbance permit and an EPD notice of intent within 200 feet of state waters, over one acre, or in a common development, then waits 14 days after the notice before issuing permits.
Source: Greene County, GA: Erosion Control Permit Requirements
The city code treats a property within 500 feet of its public sewer as having sewer available and allows the city to order connection within 90 days. That is a wider net than the state's 200-foot rule.
Specialists are in the office from 8:30 to 10 a.m. on weekdays at 1031 Apalachee Avenue, Greensboro. Call 706-453-4471 early.
Source: Northeast Health District: Greene County locations (Environmental Health)
Georgia's rule keeps absorption fields 50 feet from the lake's normal water level and 100 feet from wells. Greene's lot rule is separate and stacks on top: the 75-foot strip still counts against your lot size.
Source: Ga. Comp. R. & Regs. R. 511-3-1-.07, Absorption Fields (LII)
Guides
Drip vs. conventional septic on a lake lotThe choice most Reynolds and Harbor Club homesites face.Read the guide
Erosion control on a Georgia lake lotGreene's 200-foot trigger and Georgia Power's buffer in practice.Read the guide
The Georgia septic permit processThe state steps behind Greene's septic letter.Read the guide Sources
Rules, costs and local facts on this page link to the agency, code or publisher that states them. Cost figures are third-party market ranges, not our prices — estimates are free.
Reviewed by A Class Septic Services · Last updated