10% offfor military & first responders
A curbside trench with a new white PVC sewer lateral tying into the main, an excavator and traffic cones along the street.

Sewer Line Builds, Taps & Rebuilds · Lake Oconee Parkway

Sewer line installation along Lake Oconee Parkway (Georgia 44) in Greene and Putnam counties, for buildings Piedmont Water has confirmed in writing it will serve.

Lake Oconee Parkway (GA 44) and Lake Oconee Village, on Lake Oconee · Greene County. ZIP code 30642.
  • Lake Oconee & Lake Sinclair
  • Residential & commercial
  • 10% off: military & first responders

Get a free estimate

or call (678) 863-5620

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is it a lake lot? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Privacy.

The short answer

How does a building on Lake Oconee Parkway get a sewer line?

Piedmont Water has sewer along the Highway 44 corridor in north Putnam and southern Greene, but each parcel needs Piedmont's written confirmation before connecting, plus a tap fee and system development charge. A Class Septic Services then trenches and installs the building sewer and cleanouts to Georgia's plumbing code. We do not install or service grinder pumps.↗↗

Reviewed by A Class Septic Services · Last updated

At a glance

Lake
Lake Oconee
County
Greene County / Putnam County
ZIP codes
30642
Sewer
Piedmont Water Company along the corridor; septic off it
Water
Piedmont Water Company, Reynolds Water System

The Lake Oconee Parkway story

A corridor where sewer is a per-parcel answer

Georgia 44 is the lake's main street. On the Greene side its addresses read Lake Oconee Parkway, past Lake Oconee Village, the hospital, the academy and the turns to Reynolds. Piedmont Water lists the Highway 44 corridor in north Putnam and southern Greene among its sewer areas, alongside the named communities like Reynolds, Great Waters and Cuscowilla.↗

Listed is not the same as available. Piedmont tells local agents to check water and sewer separately, because a property can have one without the other, and that a line running past a vacant lot does not mean that lot can connect. Questions about never-connected land go to its development team so the answer comes back in writing. We start every Parkway sewer job with that letter in hand.↗

Demand is climbing. In September 2025, Greene commissioners rezoned 96.20 acres on the Parkway to B2 commercial and 162.10 acres to RM multifamily, and Piedmont's $22 million Carey Station project triples its reclamation capacity from 0.5 to 1.5 million gallons a day. More pads mean more building sewers to lay.↗↗

On the record

  • Piedmont explains its two one-time charges this way: a tap fee for the physical connection and a system development charge for the new connection's share of plant and pipe capacity.↗
  • Most Piedmont sewer is low-pressure, with a grinder pump at each building; Piedmont notes some of its systems are gravity sewer.↗

Who owns what

Who builds and owns what

Confirm the split for your parcel with Piedmont; community agreements can differ.
Cross-section: house, building drain, sewer lateral, cleanout, property line, tap and public sewer mainSTREETPROPERTY LINECLEANOUTTAPPUBLIC SEWER MAINSEWER LATERALBUILDING DRAINPROPERTY OWNERUTILITY
Green = sewer (APWA uniform color code)Typical handoff here: Property line
  • Piedmont Water Companymain

    Piedmont: the collection main and the plant at Carey Station↗

  • Piedmont Water Companysewer tap

    Owner pays tap fee and system development charge once Piedmont confirms availability↗

  • Piedmont Water Companysewer lateral

    The building owner, who owns the grinder pump and everything on the building side, per Piedmont↗

    Where the line sits: Building side of the connection

Piedmont designs its systems around E/One grinder pumps and says substitutes can cause backups. Pump selection, installation and service belong to Piedmont and its authorized vendors; our scope is the trench, pipe, cleanouts and backfill around that equipment.↗

Local facts

Code points for a Parkway building sewer

Each row links to the agency, code or publisher it comes from. Tap a source to check it yourself.

Georgia amendments to the 2024 International Plumbing Code (effective Jan. 1, 2026), Georgia 811 rules and OSHA.
TopicWhat it saysSource
Cleanout spacingNo more than 100 feet apart, plus one within 10 feet of the public right-of-wayGA DCA: Georgia State Amendments to the International Plumbing Code (2024 Edition), revised Jan. 1, 2026
DepthBuilding sewer at least 6 inches below gradeSame source as above
LocatabilityNew sewer laterals must be locatable by electronic methodsGeorgia 811 Excavator Manual (2024 Excavator Guide, rev. 2/2025)
Private linesLines past the meter or easement are private; utility locators will not mark themSame source as above
Trench safetyProtective system required at 5 feet deep unless in stable rockOSHA 29 CFR 1926.652, Requirements for protective systems

More about Lake Oconee Parkway

Keep the rain out of the sewer

Piedmont smoke-tested its system in 2025 to find stormwater getting in through cracked pipe, bad connections and missing cleanout caps, because storm flow can overwhelm treatment and cause overflows. A new building sewer should never give it another way in.↗

In practice that means watertight joints, cleanout caps set at finished grade and protected from mowers and traffic, and roof drains, French drains and area inlets piped to their own outfall. On a commercial pad we lay the storm and sanitary runs as two separate systems from day one.

Piedmont smoke-tested its system in 2025 to find stormwater getting in through cracked pipe, bad connections and missing cleanout caps, because storm flow can overwhelm treatment and cause overflows.

What it costs

Sewer line cost context

HomeAdvisor's 2026 national figures; Piedmont's tap and capacity charges are separate and set by Piedmont.

What moves the price

These are third-party typical market ranges, not our prices. Every job is quoted after we see it — estimates are free.

Free estimate: (678) 863-5620
  1. 01Run length from building to connection point
  2. 02Depth and trench protection
  3. 03Rock or wet clay in the trench
  4. 04Crossing existing utilities on a developed corridor

FAQ

Parkway sewer line questions

Straight answers, with the rule or record behind them. Still unsure? Call and ask the crew that digs.

(678) 863-5620

There's a Piedmont main on the Parkway in front of my lot. Am I connecting?

Only if Piedmont says so in writing. It tells agents a nearby line does not mean a vacant lot can connect.

Source: Piedmont Water: Public Education with Piedmont, Grinder Pumps and Coffee (Oct 2026)

Does Georgia's 200-foot sewer rule force me onto Piedmont?

The rule requires connection when sewer is available within 200 feet; on the Parkway, availability is Piedmont's determination, so confirm capacity first.

Source: Ga. Comp. R. & Regs. r. 511-3-1-.03, General Requirements for On-Site Sewage Management Systems (LII)

Do you install the grinder pump?

No. Piedmont's systems are built around E/One pumps and the pump is handled through Piedmont. We build the trench, pipe and cleanouts.

Source: Piedmont Water Company: Grinder Pumps

How many cleanouts does a long building sewer need?

Under Georgia's 2026 amendments, one at least every 100 feet, one within 10 feet of the right-of-way, and one at the building drain junction.

Source: GA DCA: Georgia State Amendments to the International Plumbing Code (2024 Edition), revised Jan. 1, 2026

Will 811 mark the existing private lines on my site?

Not usually. Georgia 811 treats lines past the meter or easement as private, so a private locate comes before we dig.

Source: Georgia 811 Excavator Manual (2024 Excavator Guide, rev. 2/2025)

Is a deep sewer trench safe to work in?

At 5 feet and deeper, OSHA requires sloping, shoring or a trench box unless the trench is entirely in stable rock.

Source: OSHA 29 CFR 1926.652, Requirements for protective systems

Can my roof drains tie into the new sewer?

No. Piedmont actively hunts stormwater entering its sewer because it causes overflows; drainage needs its own outlet.

Source: Piedmont Water: Smoke testing project (Apr 2025)

Ready when you are

Piedmont said yes? We'll lay the line.

Send the availability letter and the site plan. We locate, trench, lay and test the building sewer with code cleanouts, and keep it separate from your storm drainage. Military and first responders get 10% off.

(678) 863-5620

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is it a lake lot? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Privacy.

Call nowFree Estimate