10% offfor military & first responders
A compact excavator parked on red clay at dusk with loblolly pines silhouetted against an orange sky.

Excavation Services · Greensboro, GA

Excavation contractor work around Greensboro and Greene County, from home sites near town to Lake Oconee lots.

Greensboro, Greene County. ZIP code 30642.
  • Lake Oconee & Lake Sinclair
  • Residential & commercial
  • 10% off: military & first responders

Get a free estimate

or call (678) 863-5620

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is it a lake lot? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Privacy.

The short answer

What does excavation in Greensboro, GA involve?

Excavation around Greensboro means digging house sites, basements, septic and utility trenches under Greene County's erosion rules: a land disturbance permit for jobs over one acre or within 200 feet of state waters, including farm ponds and creeks. Every dig also starts with a Georgia 811 locate request at least three business days ahead.↗↗

Reviewed by A Class Septic Services · Last updated

At a glance

County
Greene County
ZIP codes
30642
Sewer
City of Greensboro (municipal water and sewerage system)
Water
City of Greensboro (with city supply wells)
Population
3,609 (ACS 2020-2024 5-year, table B01003)

Local facts

Greene County's dirt rules, in one table

Each row links to the agency, code or publisher it comes from. Tap a source to check it yourself.

When Greene County wants a land disturbance permit, what it costs, and how long it lasts.
TopicWhat it saysSource
LDP required whenOver 1 acre disturbed, within 200 ft of state waters, or inside a common development platted on or after August 2000Greene County, GA: Erosion Control Permit Requirements
Small single-family jobUnder 1 acre and outside the 200-ft zone: stand-alone ES&PC plan, LDP issued at no chargeSame source as above
Posted LDP fees$200 under 1 acre; $80 per disturbed acre above, half to the stateGreene County, GA: Land Disturbance Permit fees and requirements
LDP life6 months, renewable once for another 6Same source as above
State NOI wait14 days after the NOI is filed with EPD through GEOS before permits issueGreene County, GA: Erosion Control Permit Requirements
City wellheadsNo sewer lines within 150 ft of a Greensboro water supply wellGreensboro Code § 117-5: Wellhead protection zones, prohibited uses

The Greensboro story

Two hundred feet from water is most of Greene County

Greene's 200-foot trigger sounds narrow until you look at a county map. The county covers 406 square miles, 19 of them water, and its farm country is full of creeks and spring-fed ponds that count as state waters. A house site that is nowhere near Lake Oconee can still land inside the permit zone because of a stock pond down the hill.↗↗

The practical result is paperwork before dirt. A full permit needs an erosion control plan, the contractor's erosion control card, and proof the Notice of Intent was filed with EPD, then BMPs installed and inspected before grading or utilities go forward. With the 14-day state wait after the NOI, a Greene excavation job that needs a permit should be planned about a month out.↗↗

Greene's 200-foot trigger sounds narrow until you look at a county map.

Permits · Greene County (land disturbance), Greene County Environmental Health (septic letter), Georgia 811

Sequence for a Greensboro-area dig

  1. 01

    Check the 200-foot zone and the acreage; if a permit applies, file the NOI with EPD and start the 14-day clock.↗

  2. 02

    If the house will use septic, attach the septic letter; Greene's LDP application asks for it where applicable.↗

  3. 03

    Request the Georgia 811 locate; the ticket stays valid 30 calendar days.↗

  4. 04

    Install silt fence and the construction entrance and pass the BMP inspection before mass grading.↗

  5. 05

    Dig, shoring or benching any cut 5 feet or deeper that isn't solid rock.↗

More about Greensboro

From Broad Street lots to the I-20 corridor

Greensboro's footprint is odd. The city limits run four miles down SR 44 to I-20 Exit 130, so a commercial pad at the interchange is a city job while a farm two miles off Broad Street is county. Oconee National Forest starts about two miles northwest of town.↗

Inside town, the city's wellhead protection zones shape trench routes: sewer lines stay 150 feet from a city supply well. On septic lots out in the county, house and basement placement matters for a different reason, since an absorption field must sit 10 feet from a building with a basement.↗↗

And near any creek or pond, the state's 25-foot buffer measured from wrested vegetation is the line where spoil piles and machines don't go.↗

Greensboro's footprint is odd.

What it costs

Excavation pricing benchmarks

Published national ranges, plus Greene's own permit fee. Not a bid.

What moves the price

These are third-party typical market ranges, not our prices. Every job is quoted after we see it — estimates are free.

Free estimate: (678) 863-5620
  1. 01Whether the job falls inside Greene's permit triggers
  2. 02Rock and gravel in Lloyd and Cecil subsoils
  3. 03Haul distance for spoil that can't stay on site
  4. 04Basement depth and shoring

FAQ

Greensboro excavation questions

Straight answers, with the rule or record behind them. Still unsure? Call and ask the crew that digs.

(678) 863-5620

Do I need a land disturbance permit to dig a house site in Greene County?

You do if the job disturbs more than an acre, lies within 200 feet of state waters, or sits in a common development platted since August 2000. A single-family job under an acre outside that zone needs a stand-alone erosion plan, and that LDP is free.

Source: Greene County, GA: Erosion Control Permit Requirements

Does a farm pond count as state waters?

Greene's permit page specifically includes spring-fed ponds and creeks within its 200-foot trigger.

Source: Greene County, GA: Erosion Control Permit Requirements

How long does a Greene County land disturbance permit last?

Six months, renewable once for another six.

Source: Greene County, GA: Land Disturbance Permit fees and requirements

Why is there a wait after the NOI?

Greene notes a state-mandated 14-day waiting period after the NOI is submitted to EPD through GEOS before any permits are issued.

Source: Greene County, GA: Erosion Control Permit Requirements

What happens if we nick a line that wasn't marked?

Stop digging and contact Georgia 811 and the facility owner right away; even dents, scratches and gouges count as damage that must be reported.

Source: Georgia 811 Excavator Manual (2024 Excavator Guide, rev. 2/2025)

What does Greene County charge for a land disturbance permit?

The county lists $200 for under one acre and $80 per disturbed acre above that, with half going to the state. Single-family jobs under an acre and outside the 200-foot zone get their LDP at no charge.

Source: Greene County, GA: Land Disturbance Permit fees and requirements

Ready when you are

Digging in Greene County? Start the permit clock now.

Tell us the parcel and what you're building. We'll check the permit triggers, set the erosion controls and dig the house, septic and utility work in one sequence.

(678) 863-5620

Property type
What do you need?
Rather talk? (678) 863-5620
Where's the property?
Is it a lake lot? (optional)
Who should we call?

By submitting, you agree we may call or text you about this request. Privacy.

Call nowFree Estimate